Spinning reserves are on standby at all times, ready   to start and reach full power inside two minutes,
               to provide extra power for a surge in demand or   quickly taking over the load initially supplied by the
               in the event that a generation asset unexpectedly   ESS.
               goes offline. Using power generation assets for this
               purpose is costly, because idling engines burn fuel.   The  energy  storage  system  is  also  an  asset  that
               Instead, the ESS will provide this service, freeing up   provides  voltage  and  frequency  regulation.  With
               the engines to run in their most efficient mode when   an  energy  storage  system  on  the  grid,  excess  or
               producing electricity. The addition of energy storage   insufficient power is absorbed or supplied to provide
               will reduce fuel and maintenance costs for the utility.  a  ‘smoother’  electricity  supply  and  preserve  grid
                                                              infrastructure.
               The ESS also serves as spare capacity in the case   All these features will effectively increase the service
               of an undesired event on the grid – for example, if   quality experienced by the customers of the utility.
               a hurricane strikes and takes out transmission or
               distribution infrastructure, or an engine generating   OPTIMAL DISPATCHING
               set becomes unavailable for short periods of time. It   Impressive  as  these  individual  components  are,
               is not designed to replace generation assets, but to   the  real  star  of  the  show  is  the  GEMS  Power
               provide the vital two-hour window for the utility to   Plant  Controller,  a  product  of  the  Wärtsilä  GEMS
               bring other generators online.                 Platform Suite. GEMS is an intelligent energy asset




































               The  ESS  also  offers  grid  forming  and  ‘black-start’   management  system  that  will  not  only  provide  a
               capabilities, which are critical for vulnerable regions   single interface to control the operation of the new
               like the island of St.Thomas, where aging generators   multi-fuel engines and the energy storage system,
               used to restart a plant may become unavailable over   but will also integrate and synchronise all the other
               time. To prevent blackouts across the island, GEMS   power generation assets on the St. Thomas island
               can provide a response as fast as in 50 milliseconds.   grid and ‘optimise’ dispatching – in other words, the
               If a contingency event becomes unavoidable and   system will carry out full grid management.
               causes  a  loss  of  connection  between  generators
               and the loads, the ESS black-start function allows the   Wärtsilä’s  GEMS  conducts  this  synchronisation  in
               inverter to generate a sine wave for itself allowing,   the  most  efficient  way  possible,  by  matching  the
               for instance, Wärtsilä’s 32LG engine generating sets   electricity load with generation, so that supply equals